First Information Announcement on Environmental Impact Assessment of Panjin Bafang Industrial Co., Ltd.'s 1000 ton/year ferrocene Project
According to the requirements of the Environmental Impact Assessment Law of the People's Republic of China, the Environmental Protection Law of the People's Republic of China, the Regulations on Environmental Protection Management of Construction Projects, and the Public Participation Measures for Environmental Impact Assessment (Order No. 4 of 2018 of the Ministry of Ecology and Environment), the relevant information of Panjin Bafang Industrial Co., Ltd.'s 1000 tons/year ferrocene project (hereinafter referred to as "the Project") is hereby announced as follows:
1、 Project Overview
Project Name: Panjin Bafang Industrial Co., Ltd. 1000 tons/year ferrocene project
Construction Unit: Panjin Bafang Industrial Co., Ltd
Construction location: Liaoning New Materials Industry Economic Development Zone, Panshan County, Panjin City, Liaoning Province
Construction nature: Expansion
Project Overview: The total investment of the project is 50 million yuan, utilizing the original useful land, covering an area of 17.94 acres, and a total construction area of 4428.60 square meters. Construct a 1000 ton/year ferrocene production line and supporting facilities, with an annual output of 1000 tons of ferrocene.
Current project overview: Panjin Bafang Industrial Co., Ltd. (formerly known as Liaoning Bafang Additive Technology Co., Ltd.) currently has a modified asphalt production line with a production capacity of 100000 tons per year; A colored asphalt production line with a production capacity of 1000 tons per year. The process waste gas of the project is collected and indirectly cooled by circulating cooling water. After alkali spraying, it enters activated carbon adsorption and is discharged through a 20m high exhaust pipe after treatment; The waste gas from the thermal oil furnace is discharged through an 8m high chimney; The canteen fumes are treated by the fume purification device and discharged onto the roof of the canteen. The kitchen waste water from the project is treated in an oil separation tank and discharged into the municipal sewage network together with domestic sewage through a septic tank. Take noise reduction and vibration reduction measures for equipment noise. Set up a 5m3 hazardous waste temporary storage room, a 1.3m high cofferdam for the tank area, and a 700m3 accident pool for the factory area.
2、 Name and contact information of the construction unit
Construction Unit: Panjin Bafang Industrial Co., Ltd
Contact: Wang Xiaoming
Phone: 13842769169
Unit Address: Panjin Bafang Industrial Co., Ltd., Liaoning New Material Industry Economic Development Zone, Panshan County, Panjin City, Liaoning Province
3、 Name and contact information of the unit responsible for preparing the Environmental Impact Assessment Report
Company Name: Liaoning Zhongsheng Environmental Consulting Co., Ltd
Contact: Mr. Li
Phone: 024-25138000
Address: No. 2, Sanjia, No.6 Road, Shenyang Economic Development Zone, Tiexi District, Shenyang City
4、 The network link of the public opinion form
The public can download the public opinion form and provide feedback on public participation through the following network link: https://pan.baidu.com/s/1p6HdoYe-JJVsOuIbYrKIxg Extraction code: mutz
5、 Ways and channels for the public to express their opinions
From the date of this announcement, the public can provide their opinions and suggestions to our company through various means such as telephone, fax, letter, and filling out the public participation opinion form. Our company will fully value public opinions during the evaluation process and provide a public basis for the scientific evaluation of the project.